ISRO Gaganyaan-1 LVM-3
About the Gaganyaan-1 Mission
| Type | Test Flight |
|---|---|
| Orbit | Low Earth Orbit |
| Launch Cost | $46,000,000 |
First uncrewed orbital test flight of the Gaganyaan capsule.
Launch Pad & Location
Satish Dhawan Space Centre Second Launch Pad
Satish Dhawan Space Centre, India
| Launches | 33 |
|---|---|
| Orbital Launch Attempts | 32 |
| Total Launches | 105 |
Satish Dhawan Space Centre – SDSC (formerly Sriharikota Range – SHAR) is the primary spaceport of the Indian Space Research Organisation (ISRO), located in Sriharikota, Andhra Pradesh.
ISRO Launch Vehicle Mark-3 (GSLV Mk III) Rocket
The Launch Vehicle Mark-3 (LVM-3), previously called Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk III), is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). It is designed to launch satellites into geostationary orbit, and is intended as a launch vehicle for crewed missions under the Indian Human Spaceflight Programme.
| Length | 43.4 m |
|---|---|
| Diameter | 4.0 m |
| Stages | 3 |
| Launch Mass | 629.0 T |
| Takeoff Thrust | 11,898.0 kN |
| Apogee | 40,000.0 km |
| LEO Capacity | 10,000 kg |
| GTO Capacity | 5,000 kg |
| Launch Cost | $46,000,000 |
| Maiden Flight | 12/18/2014 |
Learn more about the ISRO Launch Vehicle Mark-3 (GSLV Mk III) Rocket
Mission Spacecraft
Gaganyaan G1
Gaganyaan G1 is the spacecraft assigned to this mission. It is a Hindustan Aeronautics Limited Capsule designed for The spacecraft is being designed to carry three people, and a planned upgraded version will be equipped with rendezvous and docking capability. and will travel to Low Earth Orbit.
First operational Gaganyaan capsule. Gaganyaan is an Indian crewed orbital spacecraft intended to be the formative spacecraft of the Indian Human Spaceflight Programme. Up to seven days in orbit
| Type | Capsule |
|---|---|
| Agency | Hindustan Aeronautics Limited |
| Status | Single Use |
| Destination | Low Earth Orbit |
| Maiden Flight | 10/21/2023 |
| Crew Capacity | 3 |
| Human Rated | Yes |
| Height | 3.6 m |
| Diameter | 3.5 m |
About ISRO
The Indian Space Research Organisation (ISRO) is the space agency of the Government of India headquartered in the city of Bangalore. Its vision is to "harness space technology for national development while pursuing space science research and planetary exploration."
| Total Launches | 100 |
|---|---|
| Successful | 85 |
| Failed | 15 |
| Pending | 21 |
| Consecutive Success | 1 |
Frequently Asked Questions
When is the ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 launch scheduled?
The ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 launch is currently scheduled for:
.
Launch times are subject to change based on weather conditions, technical readiness, and range availability. Check back regularly for the most up-to-date launch time and status updates.
Where is the ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 mission launching from?
The ISRO LVM-3 (GSLV Mk III) rocket will launch from Satish Dhawan Space Centre Second Launch Pad at Satish Dhawan Space Centre, India. Satish Dhawan Space Centre – SDSC (formerly Sriharikota Range – SHAR) is the primary spaceport of the Indian Space Research Organisation (ISRO), located in Sriharikota, Andhra Pradesh. For viewing location recommendations and tips, check the launch location details above.
What rocket is being used for the Gaganyaan-1 mission?
The Gaganyaan-1 mission will launch aboard a ISRO LVM-3 (GSLV Mk III) rocket. The Launch Vehicle Mark-3 (LVM-3), previously called Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk III), is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). It is designed to launch satellites into geostationary orbit, and is intended as a launch vehicle for crewed missions under the Indian Human Spaceflight Programme. Detailed rocket specifications and performance data are available in the rocket details above.
What weather conditions could delay the ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 launch?
The ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 launch can be delayed by various weather conditions including lightning within 10 nautical miles, high winds (especially upper-level winds), thick cloud layers, precipitation, and poor visibility. Weather must be favorable at the launch site, downrange landing zones, and abort landing sites. Check the launch weather forecast above for current conditions and probability of favorable weather.
How can I get updates if the ISRO LVM-3 (GSLV Mk III) Gaganyaan-1 launch is delayed?
This page is updated in real-time with the latest ISRO LVM-3 (GSLV Mk III) launch status, including any delays or scrubs for the Gaganyaan-1 mission. You can also check our space launch schedule for the most current information. Enable push notifications through our mobile app to receive instant alerts about launch status changes, weather holds, or new launch times. We recommend following official ISRO live streams for the most immediate range updates.
Last Updated
Last Updated:
-
NET November.
-
NET Q4.
-
NET Q3.
-
NET H2 2026.
-
Delayed to NET March or later.
-
Reverted back to NET January.
-
NET March.
-
NET December.
-
NET Q4.
-
NET Q2 2025.
-
NET March 2025
-
NET February 2025.
-
NET late 2024.
-
NET 2025.
-
NET July
-
NET 1H 2024.
-
NET February 2024.
-
Q2 2024
